INSULATION - WALLS
(R Values listed below are for entire wall unit – Minus internal linings and internal Air Gap)
- Temporary – roof perimeter guard rail (Where there is a possibility of falling 3m or greater) W.A Code of Practice for the prevention of falls in the workplace – 2004
- Subcontract labour – Roof Plumber
- Roof - steel corrugated - colorbond - 0.42mm BMT
- Roof sheeting - barge capping steel - 0.55mm BMT extra for barge cap in steel – colorbond
- Roof sheeting - ridge / hip capping steel - 0.55mm BMT extra for ridge/hip cap in steel – colorbond
- Roof insulation blanket – Bradford Anticon 60 - glasswool - blanket - R 1.3 - 60mm thick
- Sarking – Bradford Thermoseal – Starter strip
Each part of an external wall in climate zone 5 with a Wall Surface Density less than 220 kg/m2 must:
+ shade the wall with a verandah, balcony, eaves, carport or the like that projects at a minimum angle of 15 degrees. Only a Metal roof with pitch 23.75º or less/Tiled roof with pitch 25.63º or less with 3 Brick course Drop off eaves Comply.+ incorporate insulation with an R-Value of greater than or equal to 0.5;+ have external glazing that complies with 3.12.2.1 with the applicable value for CSHGC in Table 3.12.2.1e reduced by 15%; and have a concrete slab floor.
- OPTION A: achieve a minimum Total R-Value of 2.8; or
- OPTION B: achieve a minimum Total R-Value of 2.4; and
- OPTION B: Each part of an external wall in climate zone 5 with a Wall Surface Density greater than or equal 220 kg/m2 (Double Brick Cavity/Masonry construction) must:
+ shade the wall with a verandah, balcony, eaves, carport or the like that projects at a minimum angle of 15 degrees. Only a Metal roof with pitch 23.75º or less/Tiled roof with pitch 25.63º or less with 3 Brick course Drop off eaves Comply.+ incorporate insulation with an R-Value of greater than or equal to 0.5;+ have external glazing that complies with 3.12.2.1 with the applicable value for CSHGC in Table 3.12.2.1e reduced by 15%; and have a concrete slab floor.
Information obtained from: NCC 2019 Volume 2 – Part 3.12.1.4 Energy Efficiency
BRICK VENEER (BUDGET)
- Kingspan AIR-CELL Permicav XV or Permishield 65 + Bradford Gold Batts Hi-Performance Wall Insulation R2.7 – (Summer Heat Flow in R-Value: 3.62 – Winter Heat flow out R-Value: 4.02)
BRICK VENEER (BEST PRACTICE)
- Kingspan Kooltherm K12 Framing Board Insulation) – 40mm Thick Board - (Summer Heat Flow in R-Value: 3.6 – Winter Heat flow out R-Value: 3.9)
DOUBLE BRICK CAVITY (BUDGET)
- Kingspan AIR-CELL Permicav XV - (Summer Heat Flow in R-Value: 1.8 – Winter Heat flow out R-Value: 2.0)
DOUBLE BRICK CAVITY (BEST PRACTICE)
- Kingspan Kooltherm K8 Cavity Board – 40mm Thick Board - (Summer Heat Flow in R-Value: 3.1 – Winter Heat flow out R-Value: 3.2)
CLADDED WALL WITH COUNTER CAVITY BATTEN (BUDGET)
- Bradford Thermoseal Wall Wrap XP + Bradford Gold Batts Hi-Performance Wall Insulation R2.7 - (Summer Heat Flow in R-Value: 3.32 – Winter Heat flow out R-Value: 3.72)
CLADDED WALL WITH COUNTER CAVITY BATTEN (BUDGET)
- Kingspan Kooltherm K12 Framing Board Insulation) – 40mm Thick Board - (Summer Heat Flow in R-Value: 3.5 – Winter Heat flow out R-Value: 3.7)
INSULATION USED AS CLADDING SUBSTRATE (BuildItEco Thermawall Including double sided reflective Sarking (Direct Fix)
- 100mm Thick Orange Board - (Summer Heat Flow in R-Value: 3.25 – Winter Heat flow out R-Value: 3.41)
INSULATION USED AS CLADDING SUBSTRATE (BuildItEco Thermawall Including double sided reflective Sarking (Batten Cavity Fix – BEST PRACTICE)
- 100mm Thick Orange Board - (Summer Heat Flow in R-Value: 3.41 – Winter Heat flow out R-Value: 3.57)
Exterior and Cavity Insulation Pricing and R-Value Chart
Note: Refer to tables above for Material cost of selected Wall assembly insulation systems and achievable R Values. We have only selected systems that incorporate a vapour permeable, reflective radiant barrier with Bulk insulation. Radiant Barriers rely on a 25mm insulating air gap to be efficient, and must be kept clean from any dust or debris. Although higher R-values can be achieved on paper utilising a combination of reflective sarking and high performance wall batts, it should be noted that the R-Value does not take into account the loss of R-value of the wall system as a result of Timber/steel framing members.